Search
Markets
Services
Mount Pleasant, WI
Now completed, the Pike River Pathway is ideal for cyclists, runners and others who desire a safe means of travel and recreation in Kenosha County.
Milwaukee, WI
As part of a $55 million redevelopment, the Fortress features a traditional site design to complement its historic character.
Kenosha, WI
This historic building was transformed from a dilapidated structure into an 80-room boutique hotel in Kenosha's Downtown District.
Appleton, WI
Ecologists have been instrumental in reviewing this 115-acre site's 55 wetlands so site engineering could eventually begin.
Pleasant Prairie, WI
The County H roundabout provides increased efficiency and improved safety for the growing traffic in this rapidly developing area.
Cottage Grove, WI
Structural engineering helped bring the much-needed Summit Credit Union headquarters and branch office building together for customers and employees.
Wheatland, WI
Using a UAS system, raSmith captured over 130 aerial images as part of a study to examine solutions for high water elevations at Lily Lake.
Milwaukee County, WI
raSmith provided 3D laser scanning, 3D as-built modeling and surveying services for a substation expansion for a Wisconsin-based utility company.
Milwaukee, WI
Traffic and a troubling intersection were improved as was the road's pavement condition with the reconstruction of Lilly Road.
Structural engineering for this new primary school included cost-saving measures for its design that fit the landscape and emerged from the hillside.