TID No. 4 Globe Drive Extension

Mount Pleasant, WI

Project Overview

The Village of Mount Pleasant established Tax Incremental District (TID) No. 4 in 2015, which overlaps a large portion of TID No. 1 (260 acres). Phase 2 of TID No. 4 encompasses a portion of undeveloped land along the well-traveled WIS 20 corridor south of IH-94.

raSmith has been working with the Village on TID No. 1. For TID No. 4, the firm provided public and private civil design, topographic survey and construction administration services for the public 1,200-foot urban road extension, state highway connection and improvements for the business park.

Site design included public sanitary sewer, water main and storm sewer. The team also provided rough site grading and stormwater management for the 30-acre site. Permitting included WDNR stormwater and erosion control, sanitary and water extension, and WisDOT right-of-way and road reconstruction.