Erosion Control 101: How to Reduce Sediment Loss on Construction Sites

Sediment loadings take a toll on our waterways. While there are a variety of sources that contribute to these loadings, a construction site is a source that can be contained with the proper measures. Construction sites are constantly evolving throughout a project’s road to completion. The need for various erosion control measures can also evolve throughout this timeframe. Below are a few common best management practices that can be used to keep your site from degrading and losing sediment.

Trackout Control Practices

Trackout control practices are vital to keep neighboring roads clear of sediment and mud. When a site lacks a proper trackout control practice, sediment can be tracked out where it can then be washed into adjacent ditches and storm sewers. Typically, a stone tracking pad that is at least 50 feet in length and 12 feet wide will be installed near the exit of the site.

The Wisconsin Department of Natural Resources (WDNR) recently released their Technical Standard 1057 in July of this year. This updated standard calls for a 3-inch clear stone gradation for a stone tracking pad but also now allows for a manufactured trackout device at a minimum of 32 feet in length. The benefit to a manufactured trackout device is the ability to re-use it on future sites. It also eliminates the need for maintenance of a stone tracking pad, although washing of this device to assure its effectiveness will still need to be monitored.

Stone Tracking Pad

Manufactured Tracking Pad

Ditch Checks

Ditch checks are critical to avoid further erosion of channel banks as well as to filter out any sediment that may already be on its way off of the site. While the type of ditch check varies depending on the design of the site, the main purpose of this measure is to deconcentrate the flow by slowing it down and spreading it out. Sand bag and rock bag ditch checks tend to be better at damming the flow to slow it down while fiber logs and straw wattles slow flow down by allowing water to pass through the media. Some sediment may settle out of the flow above the ditch check, and some will be trapped in the fiber logs and straw wattles as the water passes through them.

Ditch Check

Inlet Protection

The last line of defense at any construction site are inlet protections. If all other measures fail on site, inlet protections collect sediment before it enters a nearby inlet or ditch. It is important to note the different types of inlet protections. While installing a piece of geotextile fabric under an inlet grate may be sufficient for certain situations, it may not always have sufficient capacity to collect sediment loadings over the life of the project. If that is the case, inlet insert bags or a framed structure wrapped with geotextile fabric should be used.

Inlet Protection

With properly installed erosion control practices and the continuous monitoring of a construction site, sediment loss can be significantly reduced, allowing for improved waterways moving forward.


About the Author

Riley Stone is a civil engineer in raSmith’s Brookfield, Wis., office. He provides stormwater modeling and analysis and performs erosion control inspections for construction sites. He conducts municipality-wide pollutant loading analyses using WinSLAMM to determine TMDL (Total Maximum Daily Loading) requirements and assists municipalities in preparing MS4 annual reports.

Oakes Road, Mount Pleasant, WI

Oakes Road

Mount Pleasant, Wisconsin
Somers Substation Perspective
Sussex Village Park Overall Site
Sheboygan Falls Westside Park Master Plan

West Side Park Master Plan

Sheboygan Falls, WI