R.A. Smith National, Inc.
Our Firm
Markets and Services
Projects
News
Employment
Awards
Contact

Grants and Funding Directory


Join the conversation on our NEW
Grants Blog!

construction status

search this site

 
 
 
 
 

Projects

Roundabouts

Project

Description

Year

27th Street / STH 241 Corridor
Milwaukee County, Wis.

Conceptual design of 14 double- and triple-lane roundabouts along the 27th Street corridor in the Cities of Franklin and Oak Creek

2009

USPS entrance intersection with College Avenue
Oak Creek, Wisconsin

Design review for one single-lane roundabout

2009
CTH J intersection with
CTH  EB
Howard, Wisconsin
Design review for one single-lane roundabout 
2009
USH 53 intersection with WIS 35/George Street LaCrosse, Wisconsin Conceptual design and feasibility assessment for one multi-lane roundabout 
2009

CTH P / CTH PV
Washington County, Wis.

1 single lane design

2006 - 2008

STH 145 Interchanges
with USH 41 & USH 45

Richfield, Wisconsin

System of 3, two-lane roundabouts and 2 single-lane roundabouts

2006-2008


USH 41 / STH 441
Fox Valley, Wis.

Conceptual design of 39 single-, double-, and triple-lane roundabouts at interchanges on USH 41 and STH 441

2008-present

CTH OO and CTH N Corridors
Little Chute, Wis.

System of 5, two-lane roundabouts

2008

USH 12 / STH 23
Lake Delton, Wis.

1 two-lane design

2007-2008

CTH P / I-94 Interchange
Waukesha County, Wis.

System of 1 single-lane roundabout, 1 two-lane roundabout, and 2 three-lane roundabouts

2007

STH 26 Corridor
Watertown, Wis.

9 single-lane designs (1 with 2 bypass lanes) and 1 two-lane design

2006-present

STH 60 Corridor, Slinger to Jackson, Wis.

5 multi-lane designs
(1 triple-lane entry)

2005-present

Grange Avenue / Southridge Mall Primary Access
Greendale, Wis.

1 two-lane design

2007

CTH C / I-94 Interchange
Kenosha County, Wis.

System of 4 two-lane roundabouts

2006-2007

CTH K / I-94 Interchange
Kenosha County, Wis.

System of 4 single-lane designs plus bypass lanes

2006-2007

STH 60 / USH 41 Interchange
Slinger, Wis.

System of 3 two-lane roundabouts

2006

STH 54 / I-43 Interchange
Green Bay, Wis.

System of 2 multi-lane roundabouts (triple entries on each)

2006

Breezewood Lane / Tular Road
Neenah, Wis.

Construction services on 1 single-lane roundabout

2005

Racine Avenue / I-43 Interchange
Mukwonago, Wis.

System of 2 two-lane roundabouts

2005-2006

WisDOT Design Reviews

18 single-lane designs

2004-2006

STH 32 / Lake Drive
Bayside, Wis.

1 single-lane design

2005

Chapman Farms Development
Mukwonago, Wis.

4 single-lane designs

2005

More Information

For more information about roundabouts or to discuss a potential project, please contact Pat Hawley at 262-317-3204 or Doug Senso at 920-731-8397, ext. 3403.

 

 

Bottom bar